Engineering & Performance Testing

We take readings at your site and explain what the results mean, so your team can plan maintenance or decide whether an upgrade is worth pursuing.

Request a Quotation
Cooling tower spray nozzles and fill during inspection
From the team’s field experience

What the work can include

Cooling Tower Performance Assessment

Review water temperatures, flow, entering wet-bulb temperature and operating conditions.

Airflow Measurement

Agree the traverse locations and measurement method before calculating airflow.

Fan Performance Inspection

Review fan condition, speed and electrical readings as agreed.

Air Velocity Measurement

Take point readings over an agreed plane and document measurement conditions.

Temperature & Flow Measurement

Record water temperatures and flow using agreed measurement points and methods.

Mechanical Inspection

Review accessible parts and record findings alongside the operating data.

Engineering Technical Reports

Document methods, observations, assumptions and recommended actions within the agreed scope.

What to know before starting

PERFORMANCE ASSESSMENT

Measurements with
system-level context.

Agree measurement points, instruments, duration and test conditions before work begins, so the findings answer the project’s actual questions.

Range

Hot-water inlet − cold-water outlet temperature

Approach

Cold-water outlet − entering-air wet-bulb temperature

Cooling duty

Calculated from water flow and temperature difference

Electrical power

Actual power measurement (kW) within the agreed scope

Agree the method, measurement points, instruments and assessment criteria before testing. Before-and-after comparisons consider load, flow, weather and controls. Airflow testing alone does not establish thermal performance. Site reports are not third-party certification unless included in the agreement.

LINE ↗